Saturday, September 04, 2010

Recent Projects

Below are some of our recent projects. Click Here for an expanded gallery.
alt

We've been so busy...we haven't taken pictures!

Here's a list of what's gone out in the past couple of weeks...
 
Trane Retrofit--Edwards Air Force Base
Trane Retrofit--Silver Hills School, UT
15 Ton Chillers for GE MR450W
Anderson Radiology, Anderson, NC
Baptist Health Systems, Birmingham, AL
Spruce MRI Center, Philadelphia, PA
Mercy Fitgerald, Darby, PA
Jefferson Radiology, Enfield, CT
25 Ton Chillers for GE MR750
Children's Hospital, Madera, CA
SMIL Center, Gilbert, AZ

St. Christopher's Hospital for Children

We shipped two JTS15DIAC chillers for their new Optima MR450W System.  We did custom controls to coordinate between the standard and back-up unit.

StChris4_web_small

San Bernardino Juvenile Detention Center

This was a finishing project for Trane of LA... in came a CGAM80 and out it went in under a week with three tanks, dual pumps and dual VFD's.

100_5479_web_small

University Radiology Group, New Brunswick, NJ

This site posed a problem in that the chiller was going into a parking garage.  The standard air-cooled set up wouldn't work.  So our engineers worked with the contractor and GE to solve the issue using a Horizontal Exhaust manifold to vent the exhaust air out instead of up.  The pictures speak a thousand words...

Chillers for GE Optima MR450W System

JTS15DIAC chiller for GE's Optima MR450W system. 

  • Purchased by GE for Logan Regional, Logan, UT
  • Purchased by GE for Medquest Associates, Stockbridge, GA
  • Purchased by GE for Community Radiology Group, Berwyn, PA
  • Purchased by Blue Mountain Air/Risse Mechanical for Sutter/Roseville Project, Roseville, California

East Bay Municipal Utility District Chiller

120 Ton Trane RTAC with dual centrifugal pumps and buffer tanks.  For installation with a bio-gass compression system at an EBMUD wastewater treatment plant.

Nucor Vulcraft Skid

This skid was built for a wire production facility in Brigham City, Utah.  The project included one 1,000 gallon stainless steel tank and two 250 gallon stainless in-ground tanks built by our neighbors, Superior Steel Products.

Valcour Imaging Center, Plattsburgh, New York

15 Ton Chiller for GE Optima 450W

Banner Thunderbird Hospital, Phoenix, Arizona

15 Ton Chiller with High Ambient package (special frame) for Banner Thunderbird Hospital's Discovery MR450W

Refrigeration Supplies Distributor, Billings, Montana

Champlain Valley Physicians' Hospital, Plattsburgh, New York

15 Ton Chiller for GE Optima 450W

New Product! Dairy Chiller

Triple circuit chiller for dairy applications

Calabasas Gas to Energy Project - Chiller

Three (3) 270 ton chillers with variable speed fans, aluminum micro-channel condensors and Bitzer screw compressors.

Calabasas Gas to Energy Project - Gas Treatment & Compression Skids

3,000 scfm system installed at Calabasas Landfill, Agoura Hills, California feeding 5 mw Solar Mercury 50 Gas Turbine.

Project customer: Los Angeles County Sanitation District

Contractor: Hobbs Bannerman Inc.

The Trane Co. Equipment Retrofits

Turlock Irrigation District Gas Treatment and Compression Skid

350 scfm system installed in Turlock, California, feeding1 mw fuel cell.

Pieper Power

250 scfm system installed in Waterloo, Wisconsin, for Pieper Power; feeds 650kw GE Jenbacher IC Engine.

 Other Valued Customers:

Sea World, San Diego-chiller for salt water aquarium; using corrosive resistant components

Coronado Brewing Co., Coronado, California

Mountaineer Brewing Co., Martinsburg, Virginia

Trane San Diego-numerous hydronics and pump packages

Trane Los Angeles-numerous hydronics and pump packages

Trane Salt Lake City-numerous hydronics and pump packages

Oro Loma Sanitation District —San Leandro, California

Fortuna Wastewater Treatment Plant — Fortuna, California

City of Burbank Landfill — Burbank, California

 

 

 

 

 

 

Contact Info

1614 Industrial Way, Suite 104
Caldwell, Idaho 83605

Phone: 208.453.1000
Fax: 208.453.1001

Latest News