| Below are some of our recent projects. | Click Here for an expanded gallery. |
We've been so busy...we haven't taken pictures!Here's a list of what's gone out in the past couple of weeks...
Trane Retrofit--Edwards Air Force Base
Trane Retrofit--Silver Hills School, UT
15 Ton Chillers for GE MR450W
Anderson Radiology, Anderson, NC
Baptist Health Systems, Birmingham, AL
Spruce MRI Center, Philadelphia, PA
Mercy Fitgerald, Darby, PA
Jefferson Radiology, Enfield, CT
25 Ton Chillers for GE MR750
Children's Hospital, Madera, CA
SMIL Center, Gilbert, AZ
St. Christopher's Hospital for ChildrenWe shipped two JTS15DIAC chillers for their new Optima MR450W System. We did custom controls to coordinate between the standard and back-up unit.
San Bernardino Juvenile Detention CenterThis was a finishing project for Trane of LA... in came a CGAM80 and out it went in under a week with three tanks, dual pumps and dual VFD's.
University Radiology Group, New Brunswick, NJThis site posed a problem in that the chiller was going into a parking garage. The standard air-cooled set up wouldn't work. So our engineers worked with the contractor and GE to solve the issue using a Horizontal Exhaust manifold to vent the exhaust air out instead of up. The pictures speak a thousand words...
Chillers for GE Optima MR450W SystemJTS15DIAC chiller for GE's Optima MR450W system.
East Bay Municipal Utility District Chiller120 Ton Trane RTAC with dual centrifugal pumps and buffer tanks. For installation with a bio-gass compression system at an EBMUD wastewater treatment plant.
Nucor Vulcraft SkidThis skid was built for a wire production facility in Brigham City, Utah. The project included one 1,000 gallon stainless steel tank and two 250 gallon stainless in-ground tanks built by our neighbors, Superior Steel Products.
Valcour Imaging Center, Plattsburgh, New York15 Ton Chiller for GE Optima 450W
Banner Thunderbird Hospital, Phoenix, Arizona15 Ton Chiller with High Ambient package (special frame) for Banner Thunderbird Hospital's Discovery MR450W
Refrigeration Supplies Distributor, Billings, Montana
Champlain Valley Physicians' Hospital, Plattsburgh, New York15 Ton Chiller for GE Optima 450W
New Product! Dairy ChillerTriple circuit chiller for dairy applications
Calabasas Gas to Energy Project - ChillerThree (3) 270 ton chillers with variable speed fans, aluminum micro-channel condensors and Bitzer screw compressors.
Calabasas Gas to Energy Project - Gas Treatment & Compression Skids3,000 scfm system installed at Calabasas Landfill, Agoura Hills, California feeding 5 mw Solar Mercury 50 Gas Turbine. Project customer: Los Angeles County Sanitation District Contractor: Hobbs Bannerman Inc.
The Trane Co. Equipment Retrofits
Turlock Irrigation District Gas Treatment and Compression Skid350 scfm system installed in Turlock, California, feeding1 mw fuel cell.
Pieper Power250 scfm system installed in Waterloo, Wisconsin, for Pieper Power; feeds 650kw GE Jenbacher IC Engine.
Other Valued Customers:Sea World, San Diego-chiller for salt water aquarium; using corrosive resistant components Coronado Brewing Co., Coronado, California Mountaineer Brewing Co., Martinsburg, Virginia Trane San Diego-numerous hydronics and pump packages Trane Los Angeles-numerous hydronics and pump packages Trane Salt Lake City-numerous hydronics and pump packages Oro Loma Sanitation District —San Leandro, California Fortuna Wastewater Treatment Plant — Fortuna, California City of Burbank Landfill — Burbank, California
|